DSC02574Sandman purchase as is. Start of full restoration.
Date: 29/04/08
Sandman purchase as is. Start of full restoration.
DSC02573
Date: 29/04/08
Sandman5Original interior
Date: 24/01/09
Original interior
Sandman6350 Chev engine. T400 gearbox. Extractors. Dual fuel but this will go.
Date: 24/01/09
350 Chev engine. T400 gearbox. Extractors. Dual fuel but this will go.
Sandman_1Sandman panelvan at the start.
Date: 24/01/09
Sandman panelvan at the start.
Sandman restoration May08 002
Date: 24/01/09
Sandman2008 001Over a period of 12 months all the panels have been removed, rust repaired, and paint stripped back.
Date: 24/01/09
Over a period of 12 months all the panels have been removed, rust repaired, and paint stripped back.
Sandman2008 003Paint starts to go onto the inside of doors and tailgate
Date: 24/01/09
Paint starts to go onto the inside of doors and tailgate
Sandman2008 004
Date: 24/01/09
Sandman2008 005
Date: 24/01/09
Sandman2008 006Paint goes on at last.
Date: 24/01/09
Paint goes on at last.
Sandman2008 007I have a bubble window set aside for the upper tailgate.
Date: 24/01/09
I have a bubble window set aside for the upper tailgate.
Sandman2008 009A set of GTS eight inch rims are set aside for the wheels.
Date: 24/01/09
A set of GTS eight inch rims are set aside for the wheels.
Sandman2008 011Bonnet, scoop and front spoiler will go in next - after Christmas.
Date: 24/01/09
Bonnet, scoop and front spoiler will go in next - after Christmas.