This is my HQ after spending three weeks doing body work on her. the guards are out of a padock and the nose cone should have gone to a scrap metal joint rather than back on a car Many more plotos available just snd me a msg and i'll see what i can do Date: 13/04/08 This is my HQ after spending three weeks doing body work on her. the guards are out of a padock and the nose cone should have gone to a scrap metal joint rather than back on a car
02 WB Front In the beggining with WB front Date: 13/04/08 In the beggining with WB front
08 DS DOORS Replaced Doors replaced Date: 13/04/08 Doors replaced
12 WB Front Guards Removed Stripping in progress Date: 13/04/08 Stripping in progress
24 Ready for Patching Rust hole lower a Piller driver side Date: 13/04/08 Rust hole lower a Piller driver side
31 First HQ Mock up 01 First Mock Up Date: 13/04/08 First Mock Up
39 HQ Front being prept Sanding, panel beating Date: 13/04/08 Sanding, panel beating
54 All Spray Fillered up Undercoated Date: 13/04/08 Undercoated
67 Dad's Rewiring Mess Dad the Auto electrician......what a mess Date: 13/04/08 Dad the Auto electrician......what a mess
68 DS Headlight Assembly reassembly begins Date: 13/04/08 reassembly begins
76 Ute Finished 02 finished Date: 13/04/08 finished
[-]
Stop   Pause   Back One Image   Show More Info   delay:   direction:   max size: