To get the pulley off, first remove the three screws at the front. Once that plate is off, undo the 12mm nut in the centre. Date: 27/11/04
While tapping lightly on the shaft and pulling the clutch by hand it should come off easily. You can see the clutch faces in th Date: 24/03/04
After removing the circlip, the pulley will slide off. Date: 24/03/04
Date: 24/03/04
The thickest point is only 10mm that won't be enough to machine a "V" belt grove into. I might have to use a Toyota b Date: 24/03/04
Outside pulley diameter is 125mm Date: 24/03/04
Tip to tip the grooves are about 4mm each. Date: 24/03/04
Belt width 19mm Date: 24/03/04
Pulley width 35mm Date: 24/03/04
On the right is a harmonic balancer from a Holden 6. The three bolt holes are where the extra power-steer/air-con pulleys attac Date: 24/03/04
This looks like it might fit as a crank pulley, it's off a '91 Toyota Seca power steer pump. Date: 24/03/04
91 Seca idler Date: 24/03/04
You can see the threaded bar here for the mounting brackets. In stainless, the 8mm rod is about $13 a metre. Date: 30/03/04
Custom blower manifolds will be manufactured from 2" piping. Two pipes will exit each side of the blower and merge into the Date: 30/03/04
I found this 2" stainless while hunting for scrap to make the manifolds for the blower. It has all the 90deg corners I nee Date: 12/04/04
The original fittings from a VK EFI manifold screw into this piping, very handy. Date: 12/04/04
This is how my blower arrived, I got it off eBay for $325 delivered. Date: 05/03/04
Fitted with the Toyota manifolds Date: 05/03/04
Date: 05/03/04
Date: 05/03/04
Date: 05/03/04
Date: 05/03/04
Date: 05/03/04
You can see the rotors inside. Date: 05/03/04
Standard Toyota manifold removed Date: 05/03/04
The intake side is the one closest to the motor, so I might mount it upside down to get the output closest to the motor. Date: 09/03/04
With one pipe sitting on top of the blower, you can see how they will fit together. Date: 10/05/04
a bit more grinding and shaping is required. Date: 10/05/04
a 3" pipe will be squashed (as seen in the next pic)to mate up to this end. Date: 10/05/04
I will join the 2x 2" pipes, to a squashed piece of 3". Date: 27/11/04
[-]
Stop   Pause   Back One Image   Show More Info   delay:   direction:   max size: